Loading…
Choose a topic, work the problem, then check your reasoning.
For a phosphorus TMDL on an impaired lake tributary, the loading capacity is the load that just meets the in-stream standard at a critical flow ( in lb/day). The nonpoint load allocation is and a margin of safety of 10% of the loading capacity is reserved. The allowable point-source waste-load allocation is most nearly: