Highway hydrology (rational method, time of concentration, runoff) and hydraulics: gutter and inlet capacity, storm-drain pipe flow, open-channel flow, culvert headwater, energy dissipation, and detention.
6 concepts
Size storm drainage from peak runoff with Q = CiA, build a composite runoff coefficient, and find the intensity from an IDF curve at the time of concentration.
Peak discharge (cfs) from runoff coefficient (dimensionless), intensity (in/hr), area (acres). In SI, with in mm/hr, in hectares.
Why returns cfs directly with
Composite C and peak discharge
Problem. A 23-acre highway catchment is 5 acres of impervious roof/structure (), 10 acres of landscaped lawn on heavy soil (), and 8 acres of asphalt pavement (). For the design storm the intensity at the time of concentration is . Find the composite and the peak discharge.
Time of concentration then intensity
Problem. Runoff reaches a storm inlet along three segments: (1) sheet flow over dense grass () at , with
Attenuate the peak with detention storage routing, size the water-quality (first-flush) volume from the runoff coefficient, and select BMPs for stormwater treatment.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Manning's equation for storm-drain pipes and roadway channels, normal versus critical depth, the specific-energy curve, and reading the hydraulic and energy grade lines.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Determine whether a culvert runs under inlet or outlet control, compute the headwater each way and take the larger, read the performance curve, and check outlet velocity.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Compute gutter spread with the modified Manning equation, find grate and curb-opening inlet interception and efficiency, and set inlet spacing from the bypass flow.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Trace the hydraulic grade line through friction and junction losses with the energy-grade-line method, keep it below the rims, and dissipate outlet energy with riprap or a stilling basin.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Area-weighted for a mixed-cover catchment; form it before applying .
Travel time from the hydraulically most distant point to the outlet; sets the IDF duration.
TR-55 form, result in hours; overland roughness, length (ft, ft), 2-yr 24-hr rainfall (in), slope (ft/ft). The handbook uses an intensity-based FHWA form ( USCS, minutes) instead.
Regional constants for a given return period; enter with duration (min).