Intersection sight distance and sight triangles, at-grade and roundabout layout geometry, and interchange/ramp design including acceleration and deceleration lane lengths and gap acceptance.
5 concepts
Build the departure and approach sight triangles, size intersection sight distance from the gap-acceptance time as ISD = 1.47·V·t_g, and keep the triangle clear of obstructions.
Major-road leg of the sight triangle, ft. = major-road design speed (mph), = time gap (s), = ft/s per mph. AASHTO Green Book Case B/F.
Leg length for uncontrolled (Case A) / yield (Case C) approaches; = travel time (≈ 6.5 s base, reduced at low speed), ft.
AASHTO design heights defining the clear plane within the sight triangle for intersection design.
Nominal set-back of the stopped driver's eye from the edge of the major-road traveled way (passenger car, Case B departure triangle).
Left turn from a stop onto a two-lane highway
Problem. A minor street is stop-controlled at its intersection with a two-lane rural highway with a design speed of . For a passenger car turning left, find the intersection sight distance that must be cleared along the major road.
Crossing a multilane road
Problem. A stop-controlled minor road must allow a passenger car to turn left onto a major arterial whose design speed is . The turning vehicle crosses three lanes to reach its destination lane. Determine the required ISD.
Back-calculating an allowable speed
Problem. A constrained corner can provide only of clear sight along the major road for a right-turning passenger car departing from a stop (). What major-road design speed does this sight triangle support?
Use critical gap and follow-up headway to compute the gap-acceptance capacity of a minor movement, and size left/right turn lanes from warrants, deceleration, and storage length.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Distinguish diamond, cloverleaf, and directional interchanges; set ramp design speed from the mainline; and size acceleration/deceleration lanes and gore geometry from the AASHTO speed-change tables.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Lay out a modern roundabout — inscribed-circle diameter, entry/circulating/exit geometry, and the fast-path radius that sets speed and deflection — plus conventional at-grade turn-lane layout.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Lay out an at-grade intersection — intersection angle and skew, corner radii for the design vehicle, channelizing islands, and turning-path templates — from the AASHTO Green Book.
Unlocks with an access pass — one-time payment, no auto-renew. View passes
Passenger-car gap for crossing/left turns; = number of through lanes crossed. Base s (left turn) or s (right turn/cross) onto a two-lane road; s/lane for trucks.
Inverts the ISD relation when the available major-road leg is fixed by the site, mph.
Major-road SSD that ISD must not fall below; s, ft/s², = grade (decimal). From AASHTO sight-distance criteria.